Location : Hallets Way, Maddingly Pipe Size : 630mm PN12.5 SDR13.6 Client: Southern Rural Water Contractor : Yarra Valley Excavations |
|
Poly Pro worked alongside Y.V.E as they installed a new pump station in Maddingly.
Y.V.E installed the pump station right beside the Werribee River at depths of 8 Meters.
The pipework coming from the Pump station then ran up the hill towards a basin.
With wild weather creating water levels to rise in the river, YVE managed to keep the project safe and keep the water away from affecting the work they did.
Y.V.E installed the pump station right beside the Werribee River at depths of 8 Meters.
The pipework coming from the Pump station then ran up the hill towards a basin.
With wild weather creating water levels to rise in the river, YVE managed to keep the project safe and keep the water away from affecting the work they did.